6.17.2008

The Master Bath Series, Part VIII

A quick update while eating lunch. There has been much progress in the master bath since my last update. Paint is up, fixtures are up, lighting is installed, loo is installed, and half the grout is installed. The only three things that are left are to do the last of the grout, install the baseboards, and then install the new vanity top when it arrives. Soon...hopefully soon.

No comments: